Roca Honda Project

One of the largest and highest-grade uranium projects in the U.S.
- Adjacent to General Atomics’ Mount Taylor Mine
- Within trucking distance of the White Mesa Mill
- Currently in advanced stages of permitting
- Up to 2.7 million pounds of annual uranium production with a 9-year mine life
- Technical report in compliance with SK-1300 (US) and NI 43-101 (Canada)
No Data Found
Ownership
(Energy Fuels)
Measured & Indicated Mineral Resources
17.6 million pounds of uranium
1.8 million tons of mineralized material
Average grade of 0.48% U3O8
Inferred Mineral Resources
13.8 million pounds of uranium
1.5 million tons of mineralized material
Average grade of 0.46% U3O8